How a project works

From bottleneck to a running line.

Typical starting points, solved cases from practice, the workflow in twelve phases and the people who carry it.

Sound familiar?

When your line isn’t running smoothly.

01

The project manager quits – mid-project

The knowledge is in his head. Suppliers are waiting for answers. The schedule keeps running.

And nobody in the team has time to take on the project as well.

02

The investment is approved – the people are missing

Internally, the capacity or the specialist experience for this particular project is missing.

The colleague who knows every line is about to retire. Little is documented.

03

Costs are running away

Downtime, give-away, a sprawling forklift fleet. Everyone knows there is potential.

But nobody has the time and the data to put a figure on it.

04

Quotations can’t be compared

Three suppliers, three scopes, three pricing models. What’s missing is in the small print: change parts, Incoterms, acceptance criteria.

In the end the cheapest wins. The change orders come later.

05

Acceptance turns into a dispute

FAT passed, SAT under way. But the line doesn’t reach the promised output.

The supplier points at your product, you point at his machine. And the final instalment is long overdue.

06

Changeover takes as long as it always has

The line has “always run this way”. Set-up times, minor stoppages, detours in the material flow.

From the inside, you eventually stop seeing the simple improvements.

07

The PPWR is here – and nobody has time for it

The EU Packaging Regulation demands recyclability, less empty space, new formats.

Every changed pack means: convert machines or buy new ones. Who plans that on top of the day job?

08

The Machinery Regulation is coming – and the conversion is already planned

From 20 January 2027 the new EU Machinery Regulation applies. CE marking, risk assessment, modifications to existing lines – it all has to be right by then.

And who checks whether your retrofit counts as a substantial modification?

Mouse to the right: forward · to the left: back · centre: pause.

Recognise one of these?

In 30 to 60 minutes you’ll know whether and how we can help.

From practice

This is what solved looks like.

Bakery · Efficiency Day

Double the throughput – without double the risk of failure

The packaging line for cinnamon rolls was the bottleneck. The wish: a machine twice as fast.

The Efficiency Day showed the risk: a single fast pick-and-place unit would have made the whole production dependent on one component.

Solution: two slower, decoupled pick-and-place units on two parallel lines. Target exceeded – and if one unit fails, production keeps running.

Pet food · Capacity analysis

Ninth line – without a new transfer car

Eight packaging lines depended on one transfer car. Nobody knew its utilisation.

Instead of guessing, we measured: several shifts with video and stopwatch. One day of recording, two days of analysis.

Result: the car had reserves – the processes around it didn’t. With adjusted hand-overs and start-up sequences the ninth line was feasible, without a retrofit.

Food · Interim project management

Production line conversion during ongoing operation

An international food manufacturer converted a production line to new process technology – without an internal project manager. POWERJO took over the project management: tendering, supplier selection, procurement control, scheduling.

A six-figure procurement package awarded on time, conversion window kept.

Consumer goods · Tendering & award

Palletising put out to tender – quotations finally comparable

Three suppliers, three scopes, three pricing models. With POWERJO’s requirements specification and comparison matrix the quotations were normalised to the same scope – including Incoterms, change parts and acceptance criteria.

A transparent award decision instead of gut feeling – and a five-figure difference that had been invisible before.

Intralogistics · Shopfloor analysis

Forklift fleet screened, automation path mapped out

A fleet of forklifts, pallet trucks and powered pallet movers that had simply grown – nobody knew utilisation or cost. The route analysis showed: most trips run on two routes that are well suited to automated guided vehicles.

A concrete AGV business case instead of gut feeling – a decision paper for the investment.

Machine purchase · Expert network

New machine, manual in Mandarin – running anyway

A bargain machine stood in the hall: documentation only in Chinese, manufacturer unreachable, print mark and knife out of tolerance. Not technically broken – but not operable.

Through the POWERJO network came specialists who knew the system, sourced and manufactured spare parts and brought the machine into a manageable state.

Packaging optimisation · Load volume

12.5 % more cases per pallet – thanks to 20 millimetres

Cases of 380 × 290 × 215 mm used the EUR pallet up to 1,900 mm only to 83 %. Adjusting to 400 × 300 × 211 mm gave one more layer at the same number of layers per case: 72 instead of 64 cases per pallet.

On 100,000 cases: 42 instead of 48 trucks – six fewer transports, less cost, less CO₂. Check the cases’ BCT value first.

Mouse to the right: forward · to the left: back · centre: pause. The cases are real and anonymised. A reference call with a customer is possible on request.

A similar case at your plant?

Tell us briefly about it. We’ll tell you frankly what is realistic.

Project flow

From the idea to the running line.

Twelve phases, seven decision points. You can staff each phase with us individually or the whole way – the decisions stay with you.

  1. 1Initiation

    Idea & need

    Clear what is being built – and why.

    POWERJO: Consulting, feasibility, sparring partner for management

  2. Project mandate issued
  3. 2Specification

    Product, material & packaging

    Everything that runs through the line is specified and procurable – before the machine is decided.

    POWERJO: Specification, packaging development, technical purchasing of packaging materials and raw materials

  4. 3Budgeting

    Feasibility & budget

    A budget that supports the investment decision.

    POWERJO: Budget determination, decision paper, risk assessment

  5. Budget released
  6. 4Layout

    Layout & line concept

    Everything fits in space, material flow and operation.

    POWERJO: Layout planning, line concept, design

  7. 5Tendering

    Requirements specification & tendering

    Quotations that can be compared.

    POWERJO: Tender documents, supplier selection, technical purchasing

  8. 6Award

    Award

    The right supplier on solid terms.

    POWERJO: Negotiation, contract annexes, document hierarchy

  9. Award decided
  10. 7Design

    Design & engineering

    No surprises on site.

    POWERJO: Project management, design review, interface coordination

  11. Design released
  12. 8Manufacturing

    Manufacturing & FAT

    The line runs at the supplier’s before it comes to you.

    POWERJO: FAT execution, acceptance protocols, supplier control

  13. FAT passed – cleared for shipment
  14. 9Installation

    Installation & commissioning

    On schedule in the plant, without stopping ongoing production.

    POWERJO: Site management, commissioning engineers, coordination of trades

  15. 10Acceptance

    SAT & ramp-up

    Performance proven, your team has taken over.

    POWERJO: SAT execution, training organisation, acceptance

  16. Final acceptance signed
  17. 11Operation

    Operation & optimisation

    Efficiency that lasts.

    POWERJO: Process optimisation, intralogistics, interim production management

  18. 12Close-out

    Close-out & lessons learned

    Cleanly finished, knowledge secured.

    POWERJO: Final report, post-calculation, lessons-learned workshop

  19. Project closed

1 Project phase Your decision (gate)

How we deliver

You get one specialist or a complete team.

In exactly the strength your project needs. Behind every assignment at POWERJO there is a team.

One contract partner, one invoice: Your contract partner is always POWERJO GmbH. Fixed-price packages run as a contract for work, on-demand assignments as a service contract – no temporary agency work.

A network behind you

One person with you, the knowledge of many

You book one specialist. You get the experience of the whole network on top.

If your project manager hits a specialist question, he asks colleagues who have already solved exactly that. No surcharge, no second invoice.

Complete team

Individually or as a whole crew

We put together what your project needs: project manager · process engineer · packaging engineer · design engineer · site manager · fitters.

Fair billing

You only pay for what you need

Role-specific rates instead of a flat rate.

An Excel analysis costs the back-office rate, a design job the design rate – not the project manager rate for everything. You don’t pay for overhead you don’t use.

The network

The specialists behind POWERJO.

Behind POWERJO are more than 60 vetted specialists from packaging technology, mechanical engineering, automation and production.

The profiles below are an excerpt, not a complete list. We put your team together individually: single specialists or a group, for weeks or months.

Tap a profile or hover over it – you’ll see the specialist field and typical tasks.

CAPEX project manager
Senior project manager plant engineering
Design & technical documentation
Technical management
Operations organisation & plant management
On-site manager & site management
Plant management, food
Packaging development & line efficiency
Consultant & project management, food
Interim manager production & supply chain
Head of research & development, food
Service technician & commissioning
Design engineer special-purpose machinery
Technical draughtsman
PMO & project control
Back office & project assistance
Management consulting, production

The right team for your project?

Tell us what’s coming up. We’ll propose the line-up.

Frequently asked questions

Questions from project practice.

Project and collaboration

Does POWERJO also take over complete project management?

Yes. CAPEX projects from €50,000 to the tens of millions – from tendering through supplier management and FAT/SAT to acceptance. As interim project management, for as long as you need it.

What is an interim project manager for packaging technology – and when is one worthwhile?

An interim project manager runs your capital project – from tendering to acceptance. When the line is running, he leaves again.

He pays off when internal capacity or experience with packaging machinery is missing, a deadline is fixed or downtime gets expensive.

No fixed salary, no recruiting. A clear start, a clear end.

Machine manufacturer, engineering office or on-demand specialist – who should plan my packaging project?

The manufacturer plans around his own machine, the engineering office supplies capacity and drawings. A vendor-neutral on-demand specialist represents only your interests: requirements specification, tendering, quotation comparison, negotiation, FAT/SAT and acceptance. In practice it is often the combination – we tell you honestly which makes sense for your project.

How long does a packaging line project take from idea to acceptance?

That depends on the scope – from a few months to more than a year. The typical phases: concept and requirements specification, tendering and award, design and build at the supplier (usually the longest item), factory acceptance (FAT), installation, site acceptance (SAT) and ramp-up. Whoever specifies cleanly at the start saves weeks at the end.

How quickly can a specialist start with us?

We answer your enquiry within one working day. You usually receive the first suitable profiles within a week.

The assignment itself follows your project: one person or a group, for weeks or months.

From order to the first day on site it usually takes less than a week.

Can you provide a whole team?

Yes. We put together what your project needs: project manager, process engineer, packaging engineer, design engineer, site manager and fitters – individually or as a complete crew.

Billing is by role: an Excel analysis costs the back-office rate, a design task the design rate – not the project-manager rate for everything. You have one contract partner and one invoice.

Do the specialists work on site or remotely?

Both. Project assignments take place in your plant, across Europe and occasionally overseas. Site work, FAT and SAT only work on site.

Whatever can be done properly from a distance is done online. The Tender Package, for example, is produced entirely online.

Which languages do your specialists work in?

Our specialists work all over Europe, and most of them are multilingual. We clarify which languages your project needs right at the staffing stage.

What happens if the project manager drops out in the middle of the project?

Behind every assignment at POWERJO there is a team, not a single individual. Your contract partner is POWERJO GmbH, and more than 60 vetted specialists work in the network.

If a project manager drops out, we provide a replacement from the network at short notice. If need be, Joachim Quantz steps in himself until the new project manager from the team is on board.

How does the handover at the end of the project work – does the knowledge stay with us?

That is the goal: enable rather than create dependency. Acceptance includes training your crew and proving the performance – the project is only complete once your team has taken over the line.

At the end there is a clean close-out with lessons learned, so that the knowledge from the project is secured with you and does not stay in one person’s head.

Who is liable if something goes wrong in the project?

Your contract partner is always POWERJO GmbH, not the individual specialist. POWERJO has business liability insurance of currently €3 million, which also covers project work on your site.

The details are governed by the respective contract.

What is a decision point (gate) in the project flow?

A gate is the point in the project where you deliberately decide whether and how to continue. Our project flow has twelve phases and seven such decision points – for example project order placed, budget approved, award decided, design approved, FAT passed and final acceptance signed.

You can staff each phase with us individually or the whole way. The decisions stay with you.

How does POWERJO use AI in pre-planning – and what can it not do?

The AI takes over the legwork: a tender or a customer conversation becomes a layout, a performance balance, a bill of materials and a planning report. A first line layout is ready after 45 minutes, the complete planning package after 3 hours, checked by a second AI agent.

What it cannot do: decide. Project manager and customer stay in the lead at every step; the AI makes no decision on its own.

Packaging technology and automation

What is a CAPEX project?

CAPEX stands for capital expenditure. A CAPEX project is an investment project: a new packaging line, a palletising cell, a major conversion.

POWERJO supports such projects from €50,000 to the double-digit million range – from tender to acceptance.

How do I put a packaging machine out to tender properly?

With a requirements specification that describes what the machine must deliver – products, formats, output, availability, interfaces, standards and acceptance criteria – instead of copying a manufacturer’s solution. Plus a quotation comparison matrix so that quotations really become comparable. That is exactly what our Tender Package delivers, vendor-neutral and as a template for future projects.

What belongs in a requirements specification for a packaging line?

Everything the line has to deliver – not how a particular manufacturer solves it: products and packaging materials with specifications, the complete format list with dimensions, weights and output requirements, availability, interfaces, standards and acceptance criteria for FAT and SAT.

The formats and volumes of today and of the coming years matter. Asking this question costs nothing at the start; during commissioning it costs a conversion.

How do I compare quotations from different machine builders?

Three suppliers often mean three scopes of supply and three pricing models. What is missing is in the small print: format parts, Incoterms, acceptance criteria.

Quotations only become comparable when all of them answer the same requirements specification and you lay them side by side, point by point, in a quotation comparison matrix. Our Tender Package delivers both.

What is the difference between FAT and SAT?

FAT (Factory Acceptance Test) is the acceptance at the manufacturer’s before delivery – with your products and your acceptance criteria. SAT (Site Acceptance Test) is the acceptance after installation in your plant under real conditions. Both should already be defined in the requirements specification, otherwise there is arguing instead of measuring at the end.

How do you prevent delays during commissioning?

Specify properly at the start. If products, formats, interfaces and acceptance criteria are fixed in the requirements specification, you measure at the end instead of arguing.

Plus three things from practice: sample the packaging materials beforehand and test them for machinability, run the line at the FAT with your own products before it is shipped, and plan training and support for the first weeks.

Why does a new line not reach the promised output?

More often it is due to fluctuating packaging material than to the machine. Film, carton, tray, label and adhesive have tolerances, and machines react very sensitively to them.

Add operators who have no routine yet and interfaces to peripheral equipment that do not run smoothly. If you choose the packaging material only after the award, you negotiate the output twice.

How do I increase the performance (OEE) of my existing packaging line?

First measure where the line really loses: availability, speed or quality.

Common levers: micro-stops, long changeovers, fluctuating material quality, wrongly set buffers, bottlenecks in the infeed.

The new machine is rarely the cheapest lever. Often adjustment, training and a decoupled bottleneck are enough. The Efficiency Day uncovers exactly that in one day.

Can you optimise existing plants without us investing again?

Yes – retrofit, fault analysis, shorter changeovers or better infeed control often bring more than a new purchase. We first check what your line can deliver and only then recommend an investment if it pays off.

Is automatic palletising or a robot worthwhile for my company?

What matters is pallets per shift, format variety, staff and ergonomics – not the technology as such.

Cobot, industrial robot or conventional palletiser: all have their place. Often layout and infeed decide the outcome.

We calculate the investment at full cost. And we also say when automation isn’t worthwhile yet.

What is the difference between a cobot and an industrial robot?

A cobot may work alongside people without a separating guard because force and speed are limited. An industrial robot works faster and with higher loads, but needs a safeguard such as a fence or light curtain.

Which one fits is decided by pallets per shift, weights, format variety and the space in the layout – not by the technology as such.

What does end-of-line packaging mean?

End-of-line is the last section of a production line: this is where the packed products become transport units. Typical stations are case erecting, case packing, sealing, labelling and palletising.

Our End-of-Line Packaging Adviser shows which machine chain fits your product: 29 short questions, around 8 minutes, free of charge and without an account (currently in German).

Contact

30 to 60 minutes. Your project, discussed.

Tell us what it’s about. We’ll tell you whether and how we can help.

And if we’re not the right people, we’ll say so.

  • A reply within one working day. First suitable profiles usually within a week.
  • Documents already at hand? Requirements specification, layout or quotations: send them to us – you’ll get an honest assessment.
  • References: A call with one of our customers is possible on request.

Write to us

info@powerjo.de

Book directly

powerjo.de/en/contact/

POWERJO GmbH

Holzweg 93
40789 Monheim am Rhein, Germany

By the way, our logo: the two figures are two people seen from above.

That’s how we used to draw the operator into the plant layout as technical draughtsmen – a semicircle for the shoulders, a small circle for the head. The customer saw at once where the operator side was.

POWERJO and customer shake hands and make the task a well-rounded thing. So that the project gets rolling.

AI in project planning

From enquiry to line sketch: in hours instead of weeks.

First line layout after 45 minutes, complete planning package after 3 hours, checked by a second AI agent. Four AI projects to try out, plus impulse day and workshop with your team.

More about AI at POWERJO