Our expertise on demand
for efficiency that stays.
POWERJO is the engineering team for industrial automation and packaging technology. We make processes leaner, bring costs down and get your capital projects moving – with exactly the people your project needs, and only for as long as you need them. No need to build a department of your own.
Working for international manufacturers of food, consumer goods and industrial goods – from a single tender to projects in the tens of millions.
Does this sound familiar?
When your line isn’t running smoothly.
Your project manager resigns – mid-project
The knowledge is in his head, suppliers are waiting for answers, the schedule keeps running. And nobody on the team has time to carry the project on top of their own job.
The investment is approved – the people are missing
In-house you lack the capacity or the specific experience this project needs. The colleague who knows every line in the plant is about to retire – and very little of it is written down.
Costs are running away
Downtime, give-awayProduktmenge über dem deklarierten Füllgewicht – verschenkte Ware. Bei 0,5 g Überfüllung je 100-g-Packung und 50 Mio. Packungen/Jahr sind das 250 Tonnen Produkt. Bessere Dosierung amortisiert sich hier oft schneller als, a forklift fleet that keeps growing – everyone knows there is potential. But nobody has the time and the data to put a number on it.
Quotations aren’t comparable
Three suppliers, three scopes of supply, three pricing models. What’s missing is in the small print: change parts, IncotermsStandardisierte Lieferklauseln, die regeln, wer Transport, Versicherung, Zoll und Gefahrübergang trägt. Zwei gleich teure Maschinenangebote können sich real um zehntausende Euro unterscheiden, wenn eines EXW und eines DA, acceptance criteria. In the end the cheapest wins – and the variation orders come later.
Acceptance turns into a dispute
FATAbnahmetest der Maschine beim Hersteller vor der Auslieferung. Hier werden Leistungsdaten, Funktionen und Dokumentation gegen das Pflichtenheft geprüft. Mängel, die im FAT gefunden werden, kosten einen Bruchteil dessen, passed, SATAbnahmetest nach Aufbau beim Betreiber unter realen Produktionsbedingungen – mit echtem Produkt, echtem Personal, echter Umgebung. Der erfolgreiche SAT löst meist die Schlusszahlung aus und startet die Gewährleistungsfri under way – but the line doesn’t reach the performance promised. The supplier points at your product, you point at his machine. And the final payment is long overdue.
Changeovers take as long as they always have
The line has “always run this way”. Set-up times, micro-stops, detours in the material flow – from the inside you eventually stop seeing the easy wins.
The PPWR is here – and nobody has time for it
The EU Packaging Regulation brings new requirements for recyclability, empty space and formats. Every changed pack means converting machines or buying new ones. Who plans that alongside the day job?
Mouse right: next · left: back · centre: pause.
From practice
This is what solved looks like.
Twice the throughput – without twice the failure risk
The packaging line for cinnamon rolls was the bottleneck; the customer wanted a machine twice as fast. The Efficiency Day analysis showed that a single high-speed pick-and-placeAutomatisiertes Greifen und Ablegen einzelner Produkte – etwa Riegel in Trays, Beutel in Kartons – meist mit Delta-, SCARA- oder Knickarmrobotern und Kamera zur Lageerkennung. unit would have made the entire production depend on one component.
Solution: two slower, decoupled pick-and-placeAutomatisiertes Greifen und Ablegen einzelner Produkte – etwa Riegel in Trays, Beutel in Kartons – meist mit Delta-, SCARA- oder Knickarmrobotern und Kamera zur Lageerkennung. units on two parallel lines. Target exceeded – and if one unit fails, production keeps running.
A ninth line – without a new transfer car
Eight packaging lines depended on one transfer car and nobody knew its utilisation. Instead of guessing, we measured: several shifts with video and stopwatch, one day of recording, two days of analysis.
Result: the car had spare capacity – the processes around it did not. With adjusted handovers and travel sequences, the ninth line was feasible without any retrofitModernisierung einer Bestandsanlage statt Neukauf – neue Steuerung, neue Antriebe, neue Sicherheitstechnik im alten Maschinenbett. Oft die wirtschaftlichere Alternative, wenn die Mechanik solide ist. Achtung: Ein wesentl.
Converting a production line while production continued
An international food manufacturer converted a production line to new process technology – with no in-house project manager. POWERJO took over project management: tendering, supplier selection, procurement control and schedule management.
A six-figure procurement package awarded on time, conversion window met.
Palletising put out to tender – quotations finally comparable
Three bidders, three scopes of supply, three pricing models. With a requirements specification and comparison matrix from POWERJO, the quotations were normalised to the same scope – including IncotermsStandardisierte Lieferklauseln, die regeln, wer Transport, Versicherung, Zoll und Gefahrübergang trägt. Zwei gleich teure Maschinenangebote können sich real um zehntausende Euro unterscheiden, wenn eines EXW und eines DA, change parts and acceptance criteria.
A transparent award decision instead of gut feeling – and a five-figure difference that had been invisible before.
Forklift fleet analysed, automation path identified
A fleet of forklifts, pallet trucks and powered pallet movers that had simply grown – nobody knew utilisation or cost. The route analysis showed that most trips run on two routes well suited to automated guided vehicles.
A concrete AGV business caseWirtschaftliche Begründung einer Investition: Investitionssumme, laufende Kosten, erwartete Einsparungen und Erlöse, Annahmen, Risiken, Alternativen einschließlich der Nullvariante und daraus abgeleitete Kennzahlen wie A instead of gut feeling – a decision paper for the investment.
New machine, manual in Mandarin – running all the same
A cheaply bought machine stood in the hall: documentation in Chinese only, manufacturer unreachable, print mark and knife out of tolerance. Not technically broken – but not operable either.
Through the POWERJO network we brought in specialists who knew the system, sourced and manufactured spare parts and got the machine into a manageable state.
12.5% more cases per pallet – thanks to 20 millimetres
Cases of 380 × 290 × 215 mm used only 83% of a EUR pallet up to 1,900 mm high. Changing to 400 × 300 × 211 mm added one more layer at the same layer count: 72 instead of 64 cases per pallet.
Across 100,000 cases: 42 instead of 48 trucks – six fewer transports, lower cost, less CO₂. Check the BCT value of the cases first.
Mouse right: next · left: back · centre: pause. All cases are real and anonymised.
Services
Three ways POWERJO moves your production forward.
Your line should do more – faster, more stable, with less downtime and less effort for your team. That is exactly what we come for: we find the bottlenecks in the material flow, plan and manage your capital projects from tender to acceptance, and design what is needed for it. With people who have run lines, built machines and carried project responsibility themselves – in food, consumer goods and household appliance production. We know the requirements of IFS, hygienic designKonstruktionsprinzipien für reinigungsgerechte Maschinen: keine Toträume, keine horizontalen Flächen, definierte Radien, geeignete Werkstoffe (Edelstahl), Schutzart für Nassreinigung. Im Lebensmittelbereich kein Nice-to- and HACCPPflichtkonzept der Lebensmittelsicherheit: Gefahrenanalyse mit definierten Lenkungspunkten (CCPs) – etwa Metalldetektion oder Kontrollwaage am Linienende. Maschinen an CCPs brauchen validierte Funktionen und lückenlose A from the shop floor, not from a textbook.

Process optimisation & automation
Find bottlenecks, streamline processes, unlock automation potential – from line efficiency to intralogistics.
- Bottleneck and downtime analysis (OEEDIE Kennzahl der Produktionseffizienz: OEE = Verfügbarkeit × Leistungsgrad × Qualitätsrate. Eine OEE von 60 % heißt: 40 % der geplanten Kapazität gehen durch Stillstände, reduzierte Geschwindigkeit und Ausschuss verloren)
- Robotics and handling integration
- AGV/AMR potential analysis
- Retrofits during ongoing production

CAPEX projects & project management
Capital projects from €50,000 into the tens of millions – managed from tender to acceptance. Interim project management, for as long as you need it.
- Requirements specification & tender
- Quotation comparison & award
- Supplier management, FATAbnahmetest der Maschine beim Hersteller vor der Auslieferung. Hier werden Leistungsdaten, Funktionen und Dokumentation gegen das Pflichtenheft geprüft. Mängel, die im FAT gefunden werden, kosten einen Bruchteil dessen,/SAT
- Acceptance & performance verification
- Qualification IQ/OQ/PQ (food/pharma)

Design & engineering
Plant and layout planning, CAD design and technical documentation – as an extension of your own engineering department.
- Layout and plant planning
- CAD design
- Hygienic designKonstruktionsprinzipien für reinigungsgerechte Maschinen: keine Toträume, keine horizontalen Flächen, definierte Radien, geeignete Werkstoffe (Edelstahl), Schutzart für Nassreinigung. Im Lebensmittelbereich kein Nice-to- (EHEDGInstitution und De-facto-Standard für hygienegerechte Konstruktion mit Zertifizierung von Komponenten. EHEDG-konforme Komponenten (Ventile, Pumpen, Sensoren) sind im Nassbereich der Lebensmittelproduktion die sichere Wah, IFS-compliant)
- Interface and conversion planning
- Technical documentation
Project flow
From the first idea to a running line.
Twelve phases, seven decision points. You can staff any single phase with us or the whole journey – the decisions always stay with you.
- 1Initiation
Idea & need
Clear what will be built – and why.
POWERJO: Consulting, feasibility, sparring partner for the management
- Project mandate issued
- 2Specification
Product, material & packaging
Everything that runs through the line is specified and sourceable – before the machine is chosen.
POWERJO: Specification, packaging development, technical purchasing of packaging and raw materials
- 3Budgeting
Feasibility & budget
A budget solid enough to carry the investment decision.
POWERJO: Budget estimation, decision paper, risk assessment
- Budget released
- 4Layout
Layout & line concept
Everything fits the space, the material flow and daily operation.
POWERJO: Layout planning, line concept, design engineering
- 5Tender
Requirements specification & tender
Quotations that can actually be compared.
POWERJO: Tender documents, supplier selection, technical purchasing
- 6Award
Award
The right supplier on solid terms.
POWERJO: Negotiation, contract annexes, document sequence
- Award decided
- 7Design
Design & engineering
No surprises on site.
POWERJO: Project management, design reviewFormale Prüfung des Konstruktionsstands zu definierten Zeitpunkten (Konzept, Entwurf, Detail) durch Lieferant, Betreiber und Fachabteilungen wie Instandhaltung, Arbeitssicherheit und Qualitätssicherung. Geprüft werden Fu, interface coordination
- Design released
- 8Manufacturing
Manufacturing & FATAbnahmetest der Maschine beim Hersteller vor der Auslieferung. Hier werden Leistungsdaten, Funktionen und Dokumentation gegen das Pflichtenheft geprüft. Mängel, die im FAT gefunden werden, kosten einen Bruchteil dessen,
The line runs at the supplier’s works before it comes to you.
POWERJO: FATAbnahmetest der Maschine beim Hersteller vor der Auslieferung. Hier werden Leistungsdaten, Funktionen und Dokumentation gegen das Pflichtenheft geprüft. Mängel, die im FAT gefunden werden, kosten einen Bruchteil dessen, execution, acceptance protocols, supplier control
- FATAbnahmetest der Maschine beim Hersteller vor der Auslieferung. Hier werden Leistungsdaten, Funktionen und Dokumentation gegen das Pflichtenheft geprüft. Mängel, die im FAT gefunden werden, kosten einen Bruchteil dessen, passed – cleared for shipment
- 9Installation
Installation & commissioning
On schedule in the plant, without stopping running production.
POWERJO: Site management, commissioning engineers, coordination of trades
- 10Acceptance
SATAbnahmetest nach Aufbau beim Betreiber unter realen Produktionsbedingungen – mit echtem Produkt, echtem Personal, echter Umgebung. Der erfolgreiche SAT löst meist die Schlusszahlung aus und startet die Gewährleistungsfri & ramp-up
Performance proven, your team has taken over.
POWERJO: SATAbnahmetest nach Aufbau beim Betreiber unter realen Produktionsbedingungen – mit echtem Produkt, echtem Personal, echter Umgebung. Der erfolgreiche SAT löst meist die Schlusszahlung aus und startet die Gewährleistungsfri execution, training organisation, acceptance
- Final acceptance signed
- 11Operation
Operation & optimisation
Efficiency that stays.
POWERJO: Process optimisation, intralogistics, interim production management
- 12Closure
Closure & lessons learnedStrukturierte Auswertung nach Projektende: Was lief gut, was nie wieder, was wird Standard? Die billigste Beratung, die es gibt – vorausgesetzt, die Erkenntnisse landen in Vorlagen und Checklisten fürs nächste Projekt st
Properly closed, knowledge secured.
POWERJO: Final report, post-calculation, lessons-learned workshop
- Project closed
1 Project phase Your decision (gate)
How we deliver
You get one specialist or a complete team.
Exactly as strong as your project requires. The difference to a classic freelancer agency: at POWERJO there is a team behind every assignment.
A network behind you
One person on site, the knowledge of many
You book one specialist – and get the experience of the whole network with it. If your project manager hits a specialist question, he gets the answer from colleagues who have already solved exactly that. No surcharge, no second invoice.
A complete team
Individually or as a full crew
We put together what your project needs: project manager · process engineer · packaging engineer · design engineer · site manager · fitters.
Fair invoicing
You only pay for what you need
Role-specific rates instead of a flat fee: an Excel analysis is charged at the back-office rate, a design job at the engineering rate – not the project manager rate for everything. No paid overhead you don’t use.
The network
The specialists behind POWERJO.
Behind POWERJO stands a network of more than 60 vetted specialists from packaging technology, mechanical engineering, automation and production – project managers, design engineers, process engineers, commissioning engineers and interim managers. The profiles below are a cross-section of the individual disciplines – from project management through design and technical drawing to PMO, back office and consulting – not a complete list. We put the team together individually for your task – one person or a group, for weeks or months. Tap or hover over a profile to see the specialist field and typical tasks.
Project Manager CAPEXInvestitionsausgaben für langlebige Anlagegüter – etwa eine neue Verpackungslinie oder einen Palettierer. CAPEX-Projekte werden aktiviert und über Jahre abgeschrieben, im Gegensatz zu laufenden Betriebskosten (OPEX). Typ
Layouts, P&ID, cost estimation, project and portfolio control
International senior project manager, machinery and plant engineering
Requirements/functional specification, FATAbnahmetest der Maschine beim Hersteller vor der Auslieferung. Hier werden Leistungsdaten, Funktionen und Dokumentation gegen das Pflichtenheft geprüft. Mängel, die im FAT gefunden werden, kosten einen Bruchteil dessen,/SAT, GMPRegelwerk für die 'Gute Herstellungspraxis' in Pharma-, Kosmetik- und Lebensmittelproduktion: dokumentierte Prozesse, Qualifizierung von Anlagen, Rückverfolgbarkeit. Für Maschinen bedeutet GMP-Umfeld: höhere Anforderunge, multi-project management
Mechanical engineering graduate, technical writer
Standard-compliant manuals, spare parts catalogues, CE documentation
Technical director, special machinery
Design, manufacturing, control cabinet build, CE marking, food-contact materials
Head of plant organisation, deputy plant manager
Confectionery production, materials management, packaging purchasing
Technical Project Leader
Technical project management, supplier control, schedule management
Plant manager / production manager
Commissioning of filling and base-material plants, audits, production planning
Sales director key accounts FMCGFast Moving Consumer Goods – schnelldrehende Konsumgüter wie Lebensmittel, Getränke, Kosmetik oder Reinigungsmittel. Sie werden in hohen Stückzahlen und kurzen Taktzeiten verpackt; Verfügbarkeit der Linie, Formatwechselz
Packaging and display concepts, specifications for machine investments, line efficiency
Consultant, project manager food technology
Bakery technology, plant planning and relocation, process development
Interim manager, strategic execution partner
Production relocation, ramp-up management, SAP MM/PP/EWM, supplier management
Head of R&D bakery products and baking ingredients
Product development for baking and cooking ingredients, innovation management, frozen products
Industrial mechanic, field service technician
Commissioning, installation and maintenance of packaging machines
Design engineer, machinery and special machinery
3D design (Inventor, SolidWorks), assemblies, change parts, bills of materials, manufacturing documents
Technical draughtsman / technical systems planner
Layouts and installation plans (AutoCAD, IBScad), manufacturing drawings, derivations from 3D models, drawing clean-up
Project Management Office
Schedules, cost tracking, reporting, change and risk logs, steering committee preparation
Project assistant / back office
Order processing, supplier correspondence, document control, minutes, travel and appointment organisation
Consultant for production and organisation
Plant strategy, investment appraisal, make-or-buy, organisational development, support for site decisions
For freelancers
Are you an on-demand specialist yourself?
Project managers, design engineers, packaging developers, process, electrical and civil engineers, building services planners, commissioning engineers, programmers, food technologists, sales and back-office assistants – POWERJO gets you into capital projects without having to sell yourself. We handle clients, contracts, invoicing and back office. You concentrate on what you do best.
Fixed-price packages
Start small. Gain clarity. Then decide.
No open-ended consulting contract: every package has a defined scope, a concrete result and a fixed price. The Efficiency Day even comes with a money-back guarantee.
The starting point

Tender Package
480 €*
- For one machine or one palletising system (not for a complete line)
- A freely usable, editable tender pack including requirements specification
- Quotation comparison matrix: quotes become genuinely comparable
- Vendor-neutral – the template is yours, for future projects too
- Fully online – no site visit needed, coordination by video call
The low-risk entry

Efficiency Day – 1 day on site
1.900 €*
- One day in your production: line, throughput, material consumption, operator-machine interaction, transport, bottlenecks
- Results report after 48 hours: at least 3 concrete improvements + budget estimate + prioritisation
- Vendor-neutral – no consultant slide decks, no presentation loops
- Money-back guarantee: not satisfied = no charge
The premium analysis

Shopfloor Analysis Intralogistics
3.400 €*
- Analysis of internal transport routes: the kilometres your team covers over a full year
- Result: savings potential with budgets – from AGV/AMR to a conveyor line for the main routes
- We come to you: an on-site visit to understand the routes – but without an elaborate time study
- Data basis (2D layout, pick-up/drop-off points, volume figures) provided by you – we support you with it
*plus 19% German VAT. The Efficiency Day and the Shopfloor Analysis apply at this fixed price within a 300 km radius of Monheim am Rhein – we travel across Europe as well, then with a small surcharge for travel and accommodation. The Tender Package is delivered entirely online, so no radius limit applies.
And after that? Larger projects run on a time-and-materials basis – with goals, methods, tools, timings and costs agreed together beforehand. You pay for what is needed, transparently agreed before we start.
How we work
Our values
As equals
We agree goals, methods, tools, timings and costs together before we start. We don’t arrive at your plant with ready-made answers but with questions – and the decision always stays with you.
Clarity before selling
We tell you up front what something costs and what it delivers – including when a package is too small for your task or a project doesn’t make sense right now. Role-specific rates instead of flat fees are part of that.
We leave nobody on their own
No lone fighters on assignment: there is a team behind every person, and a second pair of eyes in the important meetings. That applies to you in the project just as much as to our people in the network.
Enable, don’t tie down
As much support as needed, as much independence as wanted. Success for us means your team can do it themselves afterwards – even if that means we leave earlier.
About POWERJO
Led by someone who has done the job himself.
Joachim Quantz – born in northern Germany, plain speaking in his blood – has been at home in special machinery for 40 years and learned the trade from the ground up: from technical draughtsman through design and sales to Europe-wide project management. As an employee he delivered multi-million packaging projects for Ferrero, Mars, Jacobs Kaffee, Kraft Foods and the Schwarz Group, among others. In 2017 he founded POWERJO.
Today POWERJO provides individual specialists or complete teams for your projects – from a curated network of vetted engineers and technicians. Vetted not by a database, but by someone who can judge the work.
Since it was founded, POWERJO has worked for international groups as well as for mid-sized manufacturers – from a single tender to capital projects in the tens of millions. What drives us: lines that run. Projects that stay on schedule. And teams that can carry on by themselves afterwards.

40 years of experience
Mechanical engineering & project management
Founded in 2017
POWERJO GmbH, Monheim am Rhein
60+ specialists
available in the network
Across Europe
on project assignments – on site with the client
Frequently asked questions
Answered briefly and honestly.
Does POWERJO work at a fixed price or on a time-and-materials basis?
Both – depending on size. The three packages (Tender Package, Efficiency Day, Shopfloor Analysis) have a clear scope and a fixed price. Larger projects are invoiced on actual time and materials, with goals, methods, timings and costs agreed together beforehand. So small tasks stay predictable and on large ones you only pay for what is actually needed.
Which industries does POWERJO work for?
Manufacturing industry with a focus on food (bakery, confectionery, beverages, coffee), consumer goods, white goods and household appliances, plus industrial goods such as gas boilers, industrial filters or metal blanks – wherever packaging lines run and processes are automated. We serve pharma and life sciences at the margins.
Does POWERJO also take over complete project management?
Yes. CAPEXInvestitionsausgaben für langlebige Anlagegüter – etwa eine neue Verpackungslinie oder einen Palettierer. CAPEX-Projekte werden aktiviert und über Jahre abgeschrieben, im Gegensatz zu laufenden Betriebskosten (OPEX). Typ projects from €50,000 into the tens of millions – from tendering through supplier management and FATAbnahmetest der Maschine beim Hersteller vor der Auslieferung. Hier werden Leistungsdaten, Funktionen und Dokumentation gegen das Pflichtenheft geprüft. Mängel, die im FAT gefunden werden, kosten einen Bruchteil dessen,/SAT to acceptance. As interim project management, for as long as you need it.
Where do POWERJO’s specialists come from?
From a curated network of specialised engineers and technicians. Every one of them has been vetted professionally – by someone who has run these projects himself for 40 years. You are not buying a profile from a database, you are buying the right team.
Will POWERJO make us dependent on a consultant?
The opposite is the goal: enable rather than create dependency. As much support as needed, as much independence as wanted – if your team can do it themselves afterwards, it was a good assignment.
What is an interim project manager for packaging technology – and when is one worth it?
An interim project manager takes over your capital project – from tender to acceptance – and leaves once the line is running. He is worth it when in-house capacity or experience with packaging machinery is missing, when a deadline is fixed or when downtime is expensive. No permanent salary, no recruitment, a clear start and a clear end.
What does a freelancer or on-demand specialist in packaging technology cost?
Invoicing is by day or hourly rate, depending on the role: a service technician costs less than a senior project manager. You get a quote with a fixed rate up front and no hidden costs – no social security contributions, no recruitment fee, and the assignment ends with the project. To start, there are three fixed prices: Tender Package €480, Efficiency Day €1,900, Shopfloor Analysis €3,400.
Machine builder, engineering office or on-demand specialist – who should plan my packaging project?
The machine builder plans around his own machine; the engineering office supplies capacity and drawings. A vendor-neutral on-demand specialist represents only your interests: specification, tender, quotation comparison, negotiation, FATAbnahmetest der Maschine beim Hersteller vor der Auslieferung. Hier werden Leistungsdaten, Funktionen und Dokumentation gegen das Pflichtenheft geprüft. Mängel, die im FAT gefunden werden, kosten einen Bruchteil dessen,/SAT and acceptance. In practice it is often a combination – we will tell you honestly which one makes sense for your project.
How do I put a packaging machine out to tender properly?
With a requirements specification that describes what the machine has to achieve – products, formats, output, availability, interfaces, standards and acceptance criteria – instead of copying one manufacturer’s solution. Plus a quotation comparison matrix so that quotes really are comparable. That is exactly what our Tender Package delivers, vendor-neutral and as a template for future projects.
How long does a packaging line project take from idea to acceptance?
That depends on the scope – from a few months to over a year. The typical phases: concept and specification, tender and award, design and build at the supplier’s works (usually the longest item), factory acceptance (FATAbnahmetest der Maschine beim Hersteller vor der Auslieferung. Hier werden Leistungsdaten, Funktionen und Dokumentation gegen das Pflichtenheft geprüft. Mängel, die im FAT gefunden werden, kosten einen Bruchteil dessen,), installation, site acceptance (SATAbnahmetest nach Aufbau beim Betreiber unter realen Produktionsbedingungen – mit echtem Produkt, echtem Personal, echter Umgebung. Der erfolgreiche SAT löst meist die Schlusszahlung aus und startet die Gewährleistungsfri) and ramp-up. Specifying properly at the front end saves weeks at the back end.
How do I increase the performance (OEEDIE Kennzahl der Produktionseffizienz: OEE = Verfügbarkeit × Leistungsgrad × Qualitätsrate. Eine OEE von 60 % heißt: 40 % der geplanten Kapazität gehen durch Stillstände, reduzierte Geschwindigkeit und Ausschuss verloren) of my existing packaging line?
First measure where the line actually loses: availability, speed or quality. Common levers are micro-stops, long changeovers, fluctuating material quality, badly set buffers and bottlenecks in the infeed. The cheapest lever is rarely a new machine – often settings, training and one decoupled bottleneck are enough. The Efficiency Day uncovers exactly that in a single day.
Is automatic palletising or a robot worth it for my company?
What matters is pallets per shift, format variety, staff availability and ergonomics – not the technology itself. A cobotRoboter, der ohne trennenden Schutzzaun mit Menschen arbeiten darf – kraft- und geschwindigkeitsbegrenzt. Gut für Maschinenbeschickung und Palettierung bei kleinen Leistungen. Wichtig: Die Kollaboration muss als Gesamtap, an industrial robot or a conventional palletiser each have their place depending on the case; often the layout and the infeed decide success. We calculate the investment on a full-cost basis and will also say when automation isn’t worth it yet.
What is the difference between FATAbnahmetest der Maschine beim Hersteller vor der Auslieferung. Hier werden Leistungsdaten, Funktionen und Dokumentation gegen das Pflichtenheft geprüft. Mängel, die im FAT gefunden werden, kosten einen Bruchteil dessen, and SATAbnahmetest nach Aufbau beim Betreiber unter realen Produktionsbedingungen – mit echtem Produkt, echtem Personal, echter Umgebung. Der erfolgreiche SAT löst meist die Schlusszahlung aus und startet die Gewährleistungsfri?
FATAbnahmetest der Maschine beim Hersteller vor der Auslieferung. Hier werden Leistungsdaten, Funktionen und Dokumentation gegen das Pflichtenheft geprüft. Mängel, die im FAT gefunden werden, kosten einen Bruchteil dessen, (factory acceptance test) is the acceptance at the manufacturer’s works before delivery – with your products and your acceptance criteria. SATAbnahmetest nach Aufbau beim Betreiber unter realen Produktionsbedingungen – mit echtem Produkt, echtem Personal, echter Umgebung. Der erfolgreiche SAT löst meist die Schlusszahlung aus und startet die Gewährleistungsfri (site acceptance test) is the acceptance after installation in your plant under real conditions. Both should already be defined in the specification, otherwise you end up arguing instead of measuring.
Where does POWERJO work – will you come to us too?
We are based in Monheim am Rhein between Düsseldorf and Cologne. The fixed package prices apply within a radius of around 300 km – beyond that we travel across Europe to you, with a small surcharge for travel and accommodation. Project assignments take place across Europe, and occasionally our specialists fly overseas. The Tender Package runs entirely online.
Can you optimise existing equipment without us investing in new machinery?
Yes – a retrofitModernisierung einer Bestandsanlage statt Neukauf – neue Steuerung, neue Antriebe, neue Sicherheitstechnik im alten Maschinenbett. Oft die wirtschaftlichere Alternative, wenn die Mechanik solide ist. Achtung: Ein wesentl, fault analysis, shorter changeovers or better infeed control often deliver more than buying new. We first check what your line is capable of, and only recommend an investment once it pays off.
Looking up a technical term? More than 500 terms from packaging, automation and CAPEXInvestitionsausgaben für langlebige Anlagegüter – etwa eine neue Verpackungslinie oder einen Palettierer. CAPEX-Projekte werden aktiviert und über Jahre abgeschrieben, im Gegensatz zu laufenden Betriebskosten (OPEX). Typ – briefly explained, with practical context. (German glossary)
Your question isn’t here?
Then ask it directly. A short call, an honest assessment – and if we are not the right people, we will say so.
To take away
Tools that help straight away.
Practical templates and insights – free, no form. No sales call, just the download.
Template
Budget quotation enquiry for a palletiser
A fillable enquiry form for a palletiser as a stand-alone machine: scope of the enquiry, interfaces, format list and pack pattern, site conditions, required quotation structure, price sheet and key figures – so that suppliers submit solid, comparable budget quotations. (German document)
PDF · 6 pages · fillable on screen
Workbook
On-demand specialists – from needs analysis to handover
Six checklists along the project flow: is the need real? Is the goal measurable? Is the person the right fit? Does the knowledge end up in-house? For specialists, interim managers and consultants – with a review section as a learning store for the next project. (German document)
PDF · 9 pages · fillable on screen
White paper
On-demand specialist or permanent hire?
What both models can do, what they cost, where they fail: daily cost calculation, multi-year comparison, three questions instead of gut feeling and a checklist before you decide. Not a plea for external staff – a decision aid. (German document)
PDF · 15 pages
The three fixed-price packages as PDFs – download directly, no form. To forward to colleagues, purchasing or management. (German documents)
Fixed-price package · €480
Tender Package
Comparable quotations for a new machine: problem, scope of supply, process, price and FAQs on three pages – to forward to purchasing and engineering.
PDF · 3 pages · no form
Fixed-price package · €1,900
Efficiency Day
One working day on one line, at least three proposals after 48 hours – what we do, what you contribute, when it pays off.
PDF · 3 pages · no form
Fixed-price package · €3,400
Shopfloor Analysis Intralogistics
Two days in the plant, a digital twin of the material flow, a route diagram and measures ranked by Pareto – compact enough for the decision in-house.
PDF · 3 pages · no form
Knowledge & insights
Practice you can watch.
Two channels, one standard: no gloss, just real insight into automation and the daily life of a freelancer. (in German)
New on the POWERJO channel – see all videos →
9:00
Your project manager quits in the middle of a €2m project – that costs you €80,000
1:36
Why a 360-degree view is good for project managers
2:05
Investments in good hands
POWERJO on YouTube
Project management, FATAbnahmetest der Maschine beim Hersteller vor der Auslieferung. Hier werden Leistungsdaten, Funktionen und Dokumentation gegen das Pflichtenheft geprüft. Mängel, die im FAT gefunden werden, kosten einen Bruchteil dessen,/SAT, specifications, shop floor – short videos from practice, no slides. (in German)
Substance, not a business card
A broad network in automation and packaging
German Association of Packaging Engineers (bdvi) – head of a regional group
German Project Management Association (GPM) – member
German Packaging Museum, Heidelberg – supporter
German Agricultural Society (DLG) – member, close to the food industry
Regional hub Düsseldorf/Mettmann – workforce transformation platform (MYSOLITY GmbH)
Member of the Düsseldorf Chamber of Industry and Commerce
Creditreform Essen – member, credit rating available on request
Partner – packaging machinery and palletising solutions
Partner – worldwide machine and plant installation, commissioning
Partner – marketing for the packaging and machinery industryPublic liability insurance: €3m – covered on project assignments, including on the client’s site.
Practical know-how, by free newsletter.
The POWERJO newsletter: concrete experience from CAPEXInvestitionsausgaben für langlebige Anlagegüter – etwa eine neue Verpackungslinie oder einen Palettierer. CAPEX-Projekte werden aktiviert und über Jahre abgeschrieben, im Gegensatz zu laufenden Betriebskosten (OPEX). Typ projects, automation and packaging technology. No platitudes, no buzzword bingo – straight to your inbox. (published in German)
POWERJO News – latest issues
Contact
15 minutes. An honest assessment. No sales show.
Tell us what it is about – we will tell you whether and how we can help. If we are not the right people, we will say so.
Write to us
Book directly
POWERJO GmbH
Holzweg 93
40789 Monheim am Rhein
By the way, our logo 🙂 – the two figures are two people seen from above. That is how we used to draw the operator into a plant layout as technical draughtsmen: a semicircle for the shoulders, a small circle for the head – so the customer could see at a glance where the operating side was. Our logo follows that idea: POWERJO and client shake hands as partners and make the task a round thing – so the project gets rolling.